Medical Construction Group

About the Service

Clinical environments must perform exactly as designed. Commissioning and validation verify that building systems, life safety, and technology operate to specification before patients and staff move in. Medical Construction Group leads a structured, healthcare specific process to confirm performance, documentation, and training.

Our team coordinates functional testing for HVAC, electrical, emergency power, medical gas, fire alarm and suppression, IT or low voltage, and critical equipment. We align engineers, contractors, vendors, and authorities having jurisdiction, driving issue logs to closure and capturing evidence for occupancy and accreditation.

Turnover is operational, not ceremonial. We deliver complete O and M, life safety matrices, warranties, training plans, and asset inventories mapped to rooms and systems. The result is a clean handoff, faster activation, and fewer call backs after opening.

Why choose us

Verify performance early, open on time with confidence.

Medical Expertise

Healthcare only leadership validating systems against clinical risk, codes, and accreditation needs.

Disciplined Delivery

Phase gated checklists tie testing, issues, schedule, and approvals to defined turnover milestones.

Proven Excellence

Integrated MEP, life safety, and vendor testing produce permit and survey ready documentation.

Asset Mastery

Clinics, ASCs, imaging, MOBs, and small hospitals, including occupied renovations and rollouts.

Services offered

Popular questions

When should commissioning start?

Start during design. Early planning embeds requirements and avoids late discoveries.

HVAC, power, emergency, medical gas, fire alarm and FP, BAS, IT and low voltage, and critical equipment.

Yes. We lead governance, align scopes, and drive closure with engineers, GC, and vendors.

Evidence files, test reports, and life safety matrices streamline inspections and surveys.

O and M, warranties, as builts, logs, training records, and asset lists by room and system.

Defects are found and fixed before occupancy, cutting downtime and warranty conflicts.